Installation Instructions: House Number Signs
All Peninsula House Numbers house number signs come with a print out of installation instructions, and your installation template. We've also detailed them below if you're wanting to get prepared - or if your instructions have gone missing.
Commercial, multi-storey and elevated installations
Our signs are supplied for installation by you or your installer. We don't install, inspect sites or assess walls. If your sign is going on a commercial building, a multi-storey facade, above head height, or over a footpath, entry or other public area:
- Use a qualified tradesperson, and follow site safety and working-at-heights requirements.
- Your installer is responsible for confirming that the fixing method and adhesive suit the wall, the height, the exposure and the weight of the sign. The rods, spacers and adhesive we supply are designed for typical residential installations.
- For signs mounted above head height, use the threaded rods at every fixing point. Don't rely on adhesive alone.
- Follow the adhesive manufacturer's instructions for temperature, cure time and load, and don't install in the rain. Adhesives have a maximum service temperature, so on sun-exposed walls, especially with dark finishes, choose one rated for the temperatures the wall surface reaches.
- Check the sign is secure once installed, and include it in the building's routine maintenance inspections.
If your installer needs the weight of your sign, just ask us.